# Kurt and Cindy Hirschman
> **Administrative - Formal** · FY2017 · — · Final Order With Penalty
## Case
- **Activity ID:** `3601176693`
- **Case Number:** 02-2017-7945
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Kurt and Cindy Hirschman (complaint) (settlement)
## Summary

An EPA contractor inspected the site on August 16, 2016 and found the following: (1) facility failed to continue operation and maintenance of corrosion protection system in a temporarily closed tank system; (2) failure to continue operation and maintenance of release detection in a temporarily closed tank system; (3) failure to permanently close or upgrade a temporarily closed tank system after 12 months; (4) failure to comply with financial responsibility requirements by the required phase-in time; and (5) Failure to comply with temporary closure requirements for a tank system for 3 or more months.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*