While performing a renovation at 245 Ferry Street, New Haven CT, National Constructin violatred the RRP Rule by failing to ensure that a certified renovator was assigned to the renovation, failing to maintain records and reports, failing to cover the ground with plastic sheeting and failing to post warning signs defining the work area.