10/19/17 - SPCC EXPEDITED SETTLEMENT AGREEMENT ISSUED, ASSESSING A PENALTY OF $1,825.
SUMMARY OF FINDINGS:
- PLAN NOT CERTIFIED BY A PROFESSIONAL ENGINEER;
- INADEQUATE OR NO PREDICTION OF EQUIPMENT FAILURE WHICH COULD; RESULT IN DISCHARGES;
- PLAN DOES NOT INCLUDE INSPECTIONS AND TEST PROCEDURES IN ACCORDANCE WITH 40 CFR PART 112;
- PLAN HAS INADEQUATE OR NO DISCUSSION OF FACILITYI SECURITY;
- INADEQUATE CONTAINMENT FOR LOADING AREA (NOT CONSISTENT WITH 112.7(c));
- PLAN HAS INADEQUATE OR NO DISCUSSION OF FACILITY DRAINAGE;
- CONTAINMENT SYSTEMS, INCLUDING WALLS AND FLOORS, ARE NOT SUFFICIENTLY IMPERVIOUS TO CONTAIN OIL;
- RECORDS OF INSPECTION (OR CUSTOMARY BUSINESS RECORDS) DO NOT INCLUDE INSPECTIONS OF TANK SUPPORTS, FOUNDATION, DETERIORATION, DISCHARGES AND/OR ACCUMULATIONS OF OIL INSIDE DIKED AREAS;
- MOBILE OR PORTABLE STORAGE CONTAINERS ARE NOT POSITIONED TO PREVENT DISCHARGED OIL FROM REACHING NAVIGABLE WATER.