The Respondent gained coverage under the NJDEP CGP disturbing over 5 acres of land at the Respondent's construction site located in Trenton NJ. The Respondent failed to maintain stormwater BMPs as required by the CGP. Discharges are to SW catch basins tributary to the Delaware and Raritan Canal. Penalty calculated at 14,500.