# SNL DISTRIBUTION SERVICES CORPORATION
> **Administrative - Formal** · FY2019 · — · Final Order With Penalty
## Case
- **Activity ID:** `3601986039`
- **Case Number:** 04-2019-9965
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- SNL DISTRIBUTION SERVICES CORPORATION (complaint) (settlement)
## Summary

9/27/19 - SPCC EXPEDITED SETTLEMENT AGREEMENT ISSUED, ASSESSING A PENALTY OF $$3,225.  

VIOLATIONS:
 - PLAN NOT CERTIFIED BY A PROFESSIONAL ENGINEER;
 -  PLAN DOES NOT FOLLOW SEQUENCE OF THE RULE AND/OR CROSS-REFERENCE NOT PROVIDED;
 - PLAN HAS INADEQUATE OR NO FACILITY DIAGRAM;
 - INADEQUATE OR NO DESCRIPTION OF DRAINAGE CONTROLS;
 - RECOVERED MATERIALS NOT DISPOSED OF IN ACCORDANCE WITH LEGAL REQUIREMENTS;
 - INADEQUATE OR NO PREDICTION OF FLOW FOR EQUIPMENT FAILURE WHICH COULD RESULT IN DISCHARGES;
 - NO PERIODIC INTEGRITY AND LEAK TESTING, IF IMPRACTICABILITY IS CLAIMED;
 - NO TRAINING ON THE OPERATION AND MAINTENANCE OF EQUIPMENT TO PREVENT DISCHARGES AND/OR FACILITY OPERATIONS;
 - NO TRAINING ON DISCHARGE PROCEDURE PROTOCOLS;
 - NO TRAINING ON THE APPLICABLE POLLUTION CONTROL LAWS, RULES AND REGS, AND/OR SPCC PLAN;
 - PLAN HAS INADEQUATE OR NO DISCUSSION OF PERSONNEL AND SPILL PREVENTION PROCEDURES;
 - PLAN HAS INADEQUATE OR NO DISCUSSION OF FACILITY SECURITY;
 - PLAN HAS INADEQUATE OR NO DISCUSSION OF FACILITY TANK CAR AND TANK TRUCK LOADING/UNLOADING RACK;
 - PLAN HAS INADEQUATE OR NO DISCUSSION OF FACILITY DRAINAGE;
 - BURIED PIPING IS NOT CORROSION PROTECTED WITH PROTECTIVE WRAPPING, COATING OR CATHODIC PROTECTION PROTECTION; 
 - CORRECTIVE ACTION IS NOT TAKEN ON EXPOSED SECTIONS OF BURIED PIPING WHEN DETERIORATION IS FOUND;
 - ABOVEGROUND VALVES, PIPING AND APPURTENANCES ARE NOT INSPECTED REGULARLY;
 - PERIODIC INTEGRITY AND LEAK TESTING OF BUR

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*