WHITE STURGEON LLC (NPDES)

Administrative - Formal · FY2020 · — · Final Order With Penalty · 3602009647

Penalty
Cost recovery
Compliance action

Case

Case Number
10-2020-0001
Type
Administrative - Formal
Lead
EPA
Outcome
Final Order With Penalty
Multimedia
Self-disclosure
N

Defendants (1)

Summary

Region 10 Settles with White Sturgeon, LLC (Eagle, Idaho) for Clean Water Act Violations On November 05, 2019, Region 10 filed an Expedited Settlement Agreement resolving violations of the Clean Water Act by White Sturgeon, LLC (Respondent), located in Eagle, Idaho for their Snoqualmie Village 1 & 2 construction site (Facility). EPA alleges that the Respondent had violations of the Construction General Permit at its Facility. The alleged violations included; failure to include all minimum information as required in the CGP in the Facility?s Stormwater Pollution Prevention Plan (SWPPP) and associated site map, failure to include design specifications and installation and maintenance details of stormwater control measures (BMPs) onsite, failure to maintain sediment trackout controls and effectively manage off-site track-out, failure to adequately protect storm drain inlets, a lack of temporary stabilization measures, failure to manage stockpiles, failure to design and install adequate erosion and sediment controls/buffers, and failure to post site signage in a publicly accessible location. Since BMPs and appropriate stormwater controls are crucial to preventing sediment, and other pollutants, from entering the Waters of the U.S. (WOTUS), the environmental benefit of this action is a reduction in the potential for a pollutant discharge to WOTUS. The Respondent agreed to pay a penalty of $3,950.

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown