Facility failed to to maintain any documentation of compliance with release detection requirements. Failed to maintain records of testing of prevention equipment; testing of containment sumps; and inspection of overfill prevention equipment. Failed to either conduct periodic walkthrough inspections every thirty days or to conduct annual walkthrough and failed to comply with financial responsibility requirements by the required phase-in time. A FC was issued to the facility. The facility paid the FC and came into compliance.