On January 20, 2019, the delayed coker unit had a release of a toxic/flammable mixture of hydrocarbons and hydrogen sulfide. The root cause was a leak resulting from an incorrect valve being opened by a repair technician, which is a failure to implement safe work practices, and a violation of 40 CFR 68.69(d).