# Robert Trailer Park
> **Administrative - Formal** · FY2020 · — · Final Order No Penalty
## Case
- **Activity ID:** `3602236772`
- **Case Number:** 08-2020-0077
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order No Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Betty Roberts (complaint) (settlement)
## Summary

Within 30 calendar days of receipt of this Order, Respondent shall develop a revised Sample Plan Chart for the SSP and submit in its entirety for the EPA to review. The plan must identify sampling    sites (both routine and repeat) and a sample collection schedule that is representative of water
throughout the distribution system, as required by 40 C.F.R. ? 141.853(a)(1). A template can be found at https://www.epa.gov/region8-waterops/revised-total-coliform-rule-sample-siting-plan.
Within 90 calendar days after receipt of this Order, Respondent shall deliver a consumer notice of individual tap monitoring results to the persons served at each sampled site, in accordance with 40 C.F.R. ? 141.85(d). The included link gives access to the template for the consumer notice certification:
https://www.epa.gov/sites/production/files/documents/LCR_CN_Certification_Form.pdf. Within 90
calendar days following the end of each monitoring period, Respondent shall submit to the EPA a
sample copy of the consumer notification along with a certification that the notification has been
distributed, in accordance with 40 C.F.R. ? 141.90(f)(3).
For each calendar year, Respondent shall prepare and distribute a CCR by July 1st of the
following year and provide a certification to the EPA within three months, as required by 40 C.F.R.
?? 141.151-155.
Within 30 calendar days after receipt of this Order, and as required by Part 141 thereafter,
Respondent shall monitor the System?s water for styr

---