The facility, during the inspection, failed to: meet the requirements for periodic testing and monitoring of spill prevention equipment; either conduct periodic walkthrough inspection every thirty days or to conduct annual walkthrough inspections; operate and maintain release detection method and annually test components in accordance with manufacturer's instructions, acceptable code of practice or other requirements; or have annual line tightness test or monthly monitoring of pressurized piping. A FC was issued, the facility paid the penalty and came into compliance.