20201020 - SPCC EXPEDITED SETTLEMENT AGREEMENT ISSUED, ASSESSING A PENALTY OF $2,825. THE PENALTY ASSESSMENT DUE WITHIN 30 DAYS.
ALLEGED VIOLATIONS:
Inadequate or no prediction of flow from equipment failure which could result in discharges; Plan does not discuss and facility does not implement appropriate containment/diversionary stuctures/equipment; Inadequate discussion of containment or drainage for Loading Area; No discussion of periodic integrity and leak testing; Plan has inadequate or no discussion of facility tank car and tank truck loading/unloading rack; Secondary containment is inadequate; Aboveground tanks are not subject to periodic integrity testing techniques such as visual inspections hydrostatic testing, or other nondestructive methods; Plan has inadequate or no discussion of bulk storage tanks.