20201216 - SPCC EXPEDITED SETTLEMENT AGREEMENT ISSUED, ASSESSING A PENALTY OF $3,844. THE PENALTY ASSESSMENT DUE WITHIN 30 DAYS.
ALLEGATIONS:
Plan or sections of the hybrid plan are not certified by a professional engineer; Methods of disposal of recovered materials not in accordance with legal requirements; Inadequate containment or drainage for Loading Area; Plan has no or inadequate discussion of any applicable more stringent State rules, regulations, and guidelines; Plan does not include inspections and test procedures in accordance with 40 CFR Part 112 112.7(e); No Inspection records were available for review 112.7(e); Plan has inadequate or no discussion of facility tank car and tank truck loading/unloading rack; Secondary Containment circumvented due to containment bypass valves left open and/or pumps and ejectors not manually activated to prevent a discharge; Adequate records (or NPDES permit records) of drainage from diked areas not maintained; Aboveground tanks are not subject to periodic integrity testing techniques such as visual inspections hydrostatic testing, or other nondestructive methods; Plan has inadequate or no discussion of bulk storage tanks;
Plan has inadequate or no discussion of facility transfer operations, pumping, and facility process.