# Targa Midstream-Monument Gas Plant-RMP CAFO-FY2021
> **Administrative - Formal** · FY2021 · — · Final Order With Penalty
## Case
- **Activity ID:** `3602406276`
- **Case Number:** 06-2021-3309
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Targa Pipeline Mid-Continent WestTex LLC (complaint) (settlement)
## Summary

EPA conducted an inspection and records review on April 9-11, 2019. Respondent violated: 40 CFR 68.67(e) by failing to timely address Action items according to the timeframe set in Respondent's PHA Procedure; 40 CFR 68.69(a) by failing to fully develop the operating procedures for emergency shutdown and startup following a turnaround or emergency shutdown; 40 CFR 68.7l(b) by failing to conduct refresher trainings for certain employees within three years; 40 CFR 68.73(e) by failing to document equipment deficiencies identified from mechanical integrity inspections; 40 CFR 68.75 by failing to conduct Management of Change properly on two occasions; and, 40 CFR 
68.85(b) by failing to document all the requirements of Hot Work Permits on two occasions.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*