Lakeside Lithography failed to maintain the temperature required in its federally enforceable construction permit on 134 separate dates on the catalytic oxidizer controlling Coating Line 2 at the Chicago facility. Lakeside?s failure to maintain the required temperature was discovered during a review of temperature records that had been requested by EPA.