# ID Build LLC dba Imperial Design
> **Administrative - Formal** · FY2021 · — · Final Order With Penalty
## Case
- **Activity ID:** `3602469460`
- **Case Number:** 10-2021-0072
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- ID Build LLC (complaint) (settlement)
## Summary

On May 20, 2021, EPA Region 10 issued a Consent Agreement and Final Order to ID Build LLC d/b/a
Imperial Design (ID Build) located in Woodinville, Washington, for violations of TSCAs Lead-
Based Paint Renovation, Repair, and Painting (RRP) Rule occurring in Tacoma, Washington. EPA
Region 10 alleged that ID Build, which acted as the general contractor failed to become firm certified
prior to offering to perform renovation work on a pre-1978 residential property; failed to employ only
certified renovators, or other workers trained by certified renovators, to conduct lead-based paint
renovation activities on behalf of the firm; and failed to ensure that the subcontractor they hired utilized
the work practice standard requirements during the renovation at the pre-1978 residential property as
required by the RRP Rule. Respondent agreed to pay a penalty amount of $1,777.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*