On April 10, 2020, there was a release incident at the facility. The root cause of the event was the failure of an operator to properly implement the site?s Safety System Bypass Procedure when attempting to reseat a PSV. 19. Failure of the operator to follow the site?s safety procedures constitutes a violation of 40 CFR 68.69.