# Lupton Petroleum 112(r) consent agreement
> **Administrative - Formal** · FY2021 · — · —
## Case
- **Activity ID:** `3602712505`
- **Case Number:** 09-2021-3506
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** —
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Cole Hall (complaint) (settlement)
- Jean M. Flores (complaint) (settlement)
- Mark Nicholson (complaint) (settlement)
- Ryan Meikle (complaint) (settlement)
## Summary

Action for penalty of Lupton Petroleum regarding violations of the Clean Air Act, section 112(r), general duty clause. Counts include failure to identify hazards: Hazard review, failure to identify hazards: arc flash risk assessment, Failure to identify hazards: pressure relief valves discharge location, failure to design and maintain a safe facility: lack of design information on pressure relief valves, distillation column, and distillation equipment, failure to design and maintain a safe facility: Lack of isolation valves, failure to design and maintain a safe facility: Inadequate design information on flexible hoses used in propane servie, Failure to design and maintain a safe facility: Lack of information on safe operating limits and the consequences of deviation from those limits, failure to design and maintain a safe facility: failure to train employees in hazards of the process and operating procedures, failure to design and maintain a safe facility: failure to create and implement a program for managing change, failure to design and maintain a safe facility: lack of electrical area classification information and failure to train operators on electrical area classification information, Failure to design and maintain a safe facility: failure to create and implement a complete preventive maintenance program, failure to design and maintain a safe facility: failure to conduct a siting study.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*