This Administrative Order on Consent was entered between the Town and EPA to resolve violations of the MS4 General Permit, including conducting outfall inspections and ensuring proper operation and maintenance of post-construction controls. This action was a result of EPA's review of the Town's Annual Report and an Off-Site Compliance Evaluation.