← EPA enforcement cases

AZP PROCESS PONDS SITE, RUTHERFORD COUNTY, NORTH CAROLINA

Administrative - Formal · FY2022 · — · — · 3603086230

Penalty
Cost recovery
Compliance action

Case

Case Number
04-2022-2502
Type
Administrative - Formal
Lead
EPA
Outcome
Multimedia
Self-disclosure
N

Defendants (1)

Summary

JANUARY 19, 2022 - ADMINISTRATIVE SETTLEMENT AGREEMENT AND ORDER ON CONSENT FOR REMOVAL ACTIONS; g. On July 28, 2021, AZP initiated the removal and replacement of the liners within the raffinate pond. After removing the liners, AZP discovered a discoloration in the underlying substrate surface which suggested a potential release from the pond. AZP collected samples of the substrate material (sand and gravel) at two locations. A small amount of liquid was encountered during sampling at one of the locations. The samples were sent to AZP?s onsite QA/QC laboratory and a third-party laboratory for analysis. The liquid sample exhibited a pH less than 2 standard units (s.u.) and elevated metal concentrations. The presence of elevated metals in substrate material beneath the pond suggested material had leaked from the pond. h. On July 29, 2021, AZP received the preliminary results from its on-site laboratory which indicated elevated levels of metal concentrations. i. Upon discovering the evidence of a potential release of hazardous substances from the raffinate pond, Respondent notified the National Response Center of the release on July 29, 2021. j. This discovery of the potential release from the raffinate solution pond triggered the investigation of the depleted solution pond and the maintenance pond. To facilitate this investigation, AZP converted the Western Ponds to storage tanks with the liner system in each pond serving as secondary containment. k. On July

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown