# Harbor island, East Waterway AOC T25, Port of Seattle
> **Administrative - Formal** · FY2022 · — · —
## Case
- **Activity ID:** `3603104865`
- **Case Number:** 10-2022-0159
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** —
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Port Of Seattle (complaint) (settlement)
## Summary

This Settlement provides for the performance of a removal action,
including an engineering evaluation and cost analysis (EE/CA), by Respondent and the payment
by Respondent of certain response costs incurred by EPA at or in connection with the Terminal
25 South Site (referred to as Terminal 25, T-25 Site, or Site) within the East Waterway Operable
Unit (EWOU) of the Harbor Island Superfund Site located in Seattle, Washington.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*