# PSCO Comanche Station
> **Administrative - Formal** · FY2022 · — · Final Order With Penalty
## Case
- **Activity ID:** `3603356110`
- **Case Number:** 08-2022-0117
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- PSCO Comanche Station (complaint) (settlement)
## Summary

Respondent did not meet coal combustion residual (CCR) regulation requirements in 40 CFR 257.  Specifically, the facility failed to install an adequate groundwater monitoring system; failed to develop and submit annual groundwater monitoring and corrective action reports; failed to statistical analysis and establish background; failed to conduct semi-annual monitoring; exceeded the cease-receipt date for non-compliant surface impoundment; failed to post on information on public website, maintain information in facility operating record, and failed to provided notifications to state.  The Consent Agreement included payment of a penalty on 6/16/22 and implementation of measures to return the facility to compliance with the CCR regulations.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*