EPA Inspection completed in January, 2021. Inspection noted inadequate Best Management Practices for managing stormwater and under wet conditions (high flow conditions) stormwater runoff bypasses sediment basin and directly discharges to Cedar Creek. Facility was also not completing annual visual stormwater inspections during a discharge. For an approximate two year period facility was draining their contact water basin into their stormwater basin. This was stopped after the inspection.