1. Failed to conduct a risk and resilience assessment of the public water system and certify to EPA that a RRA was conducted by June 30, 2021.
2. Failed to prepare or revise an emergency response plan that incorporates the results of the RRA and certify to EPA that an ERP was conducted by December 31, 2021.