1. Failed to conduct a risk and resilience assessment (RRA) of the water facility and certify that an RRA was conducted by June 30, 2021.
2. Failed to prepare or revise an emergency response plan (ERP) that incorporates the results of the RRA and certify to EPA that an ERP was prepared or revised by December 31, 2021.