# East End Service Station et al.
> **Administrative - Formal** · FY2023 · — · Final Order With Penalty
## Case
- **Activity ID:** `3603468048`
- **Case Number:** 02-2023-7901
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- East End Service Station (complaint) (settlement)
- Khaled Rahhal (complaint) (settlement)
## Summary

The facility failed to conduct periodic testing of spill prevention equipment, inspect overfill prevention equipment, conduct periodic walkthrough inspections, annual test of line leak detectors, designate each individual who meets definition of Class C operator and failed to maintain a list of designator operators.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*