# Empire Service Station et al.
> **Administrative - Formal** · FY2023 · — · Final Order With Penalty
## Case
- **Activity ID:** `3603468055`
- **Case Number:** 02-2023-7902
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Empire Service Station (complaint) (settlement)
- Ishaq Yousef (complaint) (settlement)
## Summary

The facility failed to maintain documentation of compliance with release detection requirements, failed to periodically perform testing of spill prevention equipment, failed to periodically inspect overfill prevention equipment, failed to conduct periodic walkthrough inspections and failed to annually test components of release detection method.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*