# E & M Enterprises, Inc. dba Major Painting
> **Administrative - Formal** · FY2023 · — · Final Order With Penalty
## Case
- **Activity ID:** `3603476310`
- **Case Number:** 07-2023-0029
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- E&M Enterprises, Inc. d/b/a Major Painting (complaint) (settlement)
## Summary

As a result of EPA?s September 30 and October 12, 2021 TSCA RRP Records inspections, EPA alleged the following violations at 3 properties located in Kansas City and Lees Summit, Missouri:
&#61599;	40 C.F.R. 745.89(d)(2) - Failure of a firm to assign a certified renovator to the renovation. 
&#61599;	40 C.F.R.  745.86(a) and 745.86(b)(6) - Failure of a firm to retain records demonstrating compliance with the RRP Rule, including but not limited to the requirements of 40 C.F.R.  745.85. 
&#61599;	40 C.F.R.  745.84(a)(1)(i) ? Failure of a firm performing a renovation to provide the owner of the unit being renovated with the pamphlet entitled ?Renovate Right: Important Lead Hazard Information for Families, Child Care Providers and Schools and either obtain from the owner a written acknowledgement of receipt of the pamphlet, or a certificate of mailing of the pamphlet.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*