# Inchelium Short Stop
> **Administrative - Formal** · FY2023 · — · Final Order With Penalty
## Case
- **Activity ID:** `3603488207`
- **Case Number:** 10-2023-0019
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Inchelium Short Stop (complaint) (settlement)
## Summary

The facility failed to test the cathodic protection system within the last three years as required; the test was late by 11 months.  Testing found that the wiring from the rectifier to anodes was cut. To repair, pavement was excavated, and the wiring was redone from the anodes to the rectifier with new anodes added to the system.

---