Failed to conduct a risk and resilience assessment (RRA) and prepare or revise emergency plan (ERP) of the water system's drinking water supply and submit certification that an RRA was conducted and certified by June 30, 2021 and to develop an ERP based on the RRA findings by December 31, 2021.