The facility failed to do the following: installation of inadequate spill prevention equipment, maintain documentation of compliance with release detection requirements, periodic testing of spill prevention equipment, inspect overfill prevention equipment, conduct walkthrough inspections, test components of release detection, conduct annual line tightness test, test leak detectors, designate Class C operator, and maintain a list of operators. Resolved with a field citation.