# ADPP Enterprises, Inc., and APM Management, Inc.et al.
> **Administrative - Formal** · FY2023 · — · Final Order With Penalty
## Case
- **Activity ID:** `3603726453`
- **Case Number:** 02-2023-7505
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- ADPP Enterprises, Inc., and APM Management, Inc. (complaint) (settlement)
- Shivapreet Grewal (complaint) (settlement)
## Summary

EPA determined that Respondents  failed to: maintain adequate spill prevention equipment; maintain documentation of periodic walkthrough inspections; meet compliance deadlines to conduct testing of spill prevention equipment and containment sumps; meet compliance deadlines to inspect the overfill prevention equipment; conduct an annual line tightness test or conduct monthly monitoring of the underground piping; conduct an annual test for the automatic line leak detectors; and maintain release detection records. Respondents agreed to settle this administrative case by entering into a Consent Agreement and Final Order (CA/FO).

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*