# CT DEPARTMENT OF TRANSPORTATION
> **Administrative - Formal** · FY2024 · — · —
## Case
- **Activity ID:** `3603939996`
- **Case Number:** 01-2024-2037
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** —
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- CT Department of Transportation (complaint) (settlement)
## Summary

On December 12, 2023, EPA and the CT DOT entered into a Consent Order that imposes schedules for CT DOT to comply with the following requirements of the CTDEEP MS4 general permit for transportation facilities: inspect existing stormwater controls, perform short-term maintenance on stormwater controls, and create a plan for long-term inspection and maintenance at stormwater controls; to meet an interim and longer-term goal for disconnecting impervious area (thereby reducing pollutant load); to meet set schedules for implementing street sweeping; and meet set schedules for implementing catch basin inspection and cleaning.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*