# Cubbys - Pender RCRA 9006 UST - ACO or APO - Expedited Settlement Agreement
> **Administrative - Formal** · FY2024 · — · Final Order With Penalty
## Case
- **Activity ID:** `3604116906`
- **Case Number:** 07-2024-0133
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Cubbyï¿½s - Pender (complaint) (settlement)
## Summary

Respondent failed to comply with the following requirements of Subtitle I of the Resource Conservation and Recovery Act: to perform tightness testing within 30 days after completion of repair to secondary containment areas; to maintain records of repairs at time of inspection; to conduct annual walkthrough inspection; to install and calibrate release detection method in accordance with manufacturer's instructions for four sump sensors; to provide line tightness testing for piping within last 12 months for all 6 tanks; to maintain every result of sampling, testing, or monitoring for release detection for at least 1 year.

---