In resolution of EPA's allegations, Wieland has agreed to:
-Install new hooding on all of its casting furnaces to better capture emissions when pouring
-install new, higher efficiency baghouse cartridges on its #3 baghouse
-install a flow monitoring at each baghouse to verify that flow is still adequate
-conduct regular stack testing of its casting baghouses
-conduct a 3rd party study of its collection system to ensure adequate collection efficiency at its casting furnaces.