# Proteum Energy, LLC -Bryan, TX-RMP AOC-FY 2025
> **Administrative - Formal** · FY2025 · — · Final Order No Penalty
## Case
- **Activity ID:** `3604513897`
- **Case Number:** 06-2025-3466
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order No Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Proteum Energy, LLC (complaint) (settlement)
## Summary

On March 5, 2025, EPA RMP Reporting Center sent a letter to Respondent, notifying Respondent of its failure to update the RMP on file with EPA for the Facility. Based on the information provided by the Respondent, as of February 1, 2024, the Facility no longer has butane and propane above the applicable threshold quantity onsite. If the Facility is no longer covered by Part 68, the Respondent is required to submit a de-registration to EPA within six (6) months indicating that the stationary source is no longer covered pursuant to 40 C.F.R. ? 68.190(c).

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*