← EPA enforcement cases

WARD TRANSFORMER SUPERFUND SITE

Administrative - Formal · FY2025 · — · Final Order No Penalty · 3604729743

Penalty
Cost recovery
Compliance action

Case

Case Number
04-2025-7003
Type
Administrative - Formal
Lead
EPA
Outcome
Final Order No Penalty
Multimedia
Self-disclosure
N

Defendants (1)

Summary

February 17, 2026 - ADMINISTRATIVE SETTLEMENT AGREEMENT FOR CERTAIN RESPONSE ACTIONS BY BONA FIDE PROSPECTIVE PURCHASER AND LOCAL GOVERNMENT In September 2005, the EPA signed an Administrative Settlement Agreement and Order on Consent with a group of potentially responsible parties to perform the time critical removal action at the Ward Transformer facility and some immediately surrounding areas, including Reach A, subsequently identified as OU-2. The agreement required the removal of soil and sediment containing PCBs and prevention of off-site migration of material that may contain PCBs (?OU-2 Removal Action?). The OU-2 Removal Action began in 2007. The OU-2 Removal Action soil cleanup level for PCBs was 1 milligram per kilogram (mg/kg). The EPA later approved a revised cleanup level of 10 mg/kg for soil that was thermally treated or beneath the treated soil final cover system (located within the footprint. The treated soil final cover system included a geotextile fabric as a marker layer and a minimum of 1 foot of off-site soil covered with vegetation or stone. Geotextile/plastic liners, crushed stone, concrete, soil or other engineering controls were also placed in areas where PCB-contaminated soil above the 1 mg/kg cleanup level was left in place. Table 1 of the OU-2 ROD includes a summary of the engineering controls in place. These areas include areas with excavation refusal, a limited area close to Interstate 540, an embankment along Lumley Road and the former E

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown