# HAYSTACK MINES SITE BNSF RAILWAY COMPANY EE/CA AOC
> **Administrative - Formal** · FY2026 · — · Final Order With Unspecified Cost Recovery
## Case
- **Activity ID:** `3604841616`
- **Case Number:** 09-2026-2500
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Unspecified Cost Recovery
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- BNSF RAILWAY COMPANY (settlement)
## Summary

This Settlement provides for the performance of a background study, data gap analysis, and Engineering Evaluation/Cost Analysis (?EE/CA?) by Respondent and the payment of certain response costs incurred by the United States at or in connection with the Haystack Mines Site.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*