# DESHAZO PRODUCTION CO., DON DESHAZO
> **Administrative - Formal** · FY1996 · — · Unilateral Administrative Order Without Adjudication
## Case
- **Activity ID:** `36369`
- **Case Number:** 06-1996-0065
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Unilateral Administrative Order Without Adjudication
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** $6K
- **Multimedia (multi-env):** N
## Defendants
- DESHAZO PRODUCTION CO. (complaint) (settlement)
## Summary

1. SECTION 1423(C) OF THE SAFE DRINKING WATER ACT ( SDWA ),     42 U.S.C. SECTION 300H-2(C).                              2. DON DESHAZO                                                  DESHAZO PRODUCTION CO.                                       P.O. BOX 338                                                 DEWEY, OSAGE COUNTY, OKLAHOMA 74029                       3. RESPONDENT WAS IN VIOLATION OF 40 CFR SECTIONS 147.2909      AND 147.2912(A)(2) BY MAINTAINING AN INJECTION WELL WITH-    OUT MECHANICAL INTEGRITY AND 40 CFR SECTIONS 147.2909 AND    147.2911 BY FAILING TO COMPLY WITH CONSTRUCTION REQUIRE-     MENTS.                                                    4. RELIEF SOUGHT PURSUANT TO SECTION 1423(C) OF THE SDWA,       EPA PROPOSES AN ADMINISTRATIVE ORDER THAT ORDERS THE RE-     SPONDENT TO PLUG OR CONVERT INTO PRODUCTION, WELL NO. 14,    WITHIN 60 DAYS OF THE EFFECTIVE DATE OF THE ORDER AND        PLUG OR CONVERT INTO PRODUCTION, WELL NO. 26, WITHIN 120     DAYS AFTER THE EFFECTIVE DATE OF THE ORDER.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*