1. SECTION 113(A)(3) OF THE CLEAN AIR ACT ( CAA ), 42 U.S.C. SECTION 7413(A)(3). 2. RUSTON UTILITIES SYSTEM (RESPONDENT) RUSTON ELECTRICAL GENERATING STATION (FACILITY) 1801 MCDONALD AVENUE RUSTON, LOUISIANA 71273 3. RUSTON VIOLATED SECTION 412 OF THE CAA FOR MONITORING, RECORDKEEPING, AND REPORTING OF CERTAIN DATA FROM AFFECT- ED UNITS IN RELATION TO THE ACID RAIN PROGRAM AT UNITS 2 AND 3 OF THE FACILITY. 4. RELIEF SOUGHT PURSUANT TO SECTION 113(A)(3) OF THE CAA, EPA ISSUED AN ADMINISTRATIVE COMPLIANCE ORDER (AO) RE- QUIRING THE RESPONDENT, WITHIN 60 DAYS OF THE EFFECTIVE DATE OF THE AO, TO COMPLY WITH THE AO AND TO SUBMIT 1995 ELECTRONIC REPORT TO REGION 6 DOCUMENTING THE HOURLY GAS FLOW, HOURLY HEAT INPUT AND HOURLY SO2 MASS EMISSION RATE, PROVIDE A DIAGRAM OF THE FUEL FLOW METERING RUNS FOR UNIT 2 AND 3 INDICATING THE LOCATION OF THE ORIFICE PLATE IN RELATION TO FLANGE/PIPE TAPS, UPSTREAM CON- STRICTIONS, AND DOWNSTREAM CONSTRICTIONS OF THE NATUR- AL GAS PIPE LINE, 3. PROVIDE CALIBRATION DATA SHEETS FOR EACH FUEL FLOWMET- ER AT UNIT 2 AND 3 INDICATING ACCURACY OF THE PRES- SURE, DIFFERENTIAL PRESSURE, AND TEMPERATURE TRANSMIT- TER,