# C. E. MCCLURKIN DBA J-C OIL COMPANY
> **Administrative - Formal** · FY1998 · — · Final Order With Penalty
## Case
- **Activity ID:** `37698`
- **Case Number:** 06-1998-0001
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** $1K
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- C. E. MCCLURKIN (complaint) (settlement)
## Summary

1. SECTION 1423(C) OF THE SAFE DRINKING WATER ACT ( SDWA ),     42 U.S.C. SECTION 300H-2(C).                              2. MR. C. E. MCCLURKIN                                          J-C OIL COMPANY, AN OKLAHOMA COMPANY                         P.O. BOX 638                                                 BOWRING, OSAGE COUNTY, OKLAHOMA 74009                        FACILITY: OSAGE COUNTY                                       WELL NO. 104, NW/4, SEC. 36, T29N, R11E, INV. NO. OS5443  3. RESPONDENT WAS IN VIOLATION OF SECTION 1421 OF THE SDWA      BY OPERATING A CLASS II INJECTION WELL WITHOUT MECHANICAL    INTEGRITY AND FAILING TO COMPLY WITH PERMIT CONDITIONS BY    FAILING TO MONITOR AND REPORT PRODUCTION VOLUMES.         4. RELIEF SOUGHT PURSUANT TO SECTION 1423(C) OF THE SDWA,       EPA PROPOSES A CIVIL PENALTY OF $5,000, WHICH IS DUE WITH    IN 30 DAYS OF THE EFFECTIVE DATE OF THE ORDER. THE ORDER     ALSO REQUIRES THE RESPONDENT TO: 1) SUBMIT A REPORT OF       MONTHLY FLUID PRODUCTION FROM THE PRODUCTION WELLS, 2)       CEASE USE OF THE WELL FOR UNDERGROUND INJECTION OF           FLUIDS, DISCONNECT ALL INJECTION PIPELINES LEADING TO THE    WELL, AND REMOVE SUCH PIPELINES FROM THE WELL SITE NO LA-    TER THAN ONE DAY AFTER THE EFFECTIVE DATE OF THE ORDER,      AND 3) RESPONDENT MAY RESUME USE OF WELL FOR UNDERGROUND     INJECTION OF FLUIDS AFTER DEMONSTRATING MECHANICAL INTEG-    RITY OF THE WELL.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*