# TAUNTON ENERGY
> **Administrative - Formal** · FY1999 · — · Final Order With Penalty
## Case
- **Activity ID:** `39510`
- **Case Number:** 06-1999-0846
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** $600
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- TAUNTON ENERGY (complaint) (settlement)
## Summary

1. SECTION 311(B)(6)(B)(I) OF THE CLEAN WATER ACT ( CWA ),      33 U.S.C. SECTION 1321(B)(6)(B)(I), AS AMENDED BY THE OIL    POLLUTION ACT OF 1990.                                    2. TAUTON ENERGY                                                FACILITY: GRIFFIN PYLE TANK BATTERY                                    SEC. 24, T8 N, R2 E, TROUT CREEK FIELD                       TROUT, LA SALLE PARISH, LOUISIANA 71371         3. RESPONDENT WAS IN VIOLATION OF SECTION 311 OF THE CWA BY:    1) TANK MATERIAL AND CONSTRUCTION ARE NOT COMPATIBLE WITH    THE OIL STORED AND THE CONDITIONS OF STORAGE; AND 2) A-      BOVE GROUND VALVES AND PIPELINES ARE NOT EXAMINED PERIOD-    ICALLY ON A SCHEDULED BASIS FOR GENERAL CONDITION.        4. RELIEF SOUGHT PURSUANT TO SECTION 311(B)(6)(B)(I) OF THE     CWA, EPA ASSESSED THE RESPONDENT A CIVIL PENALTY OF $600     FOR THE VIOLATIONS CITED.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*