# EOTT ENERGY OPERATING LIMITED PARTNERSHIP
> **Administrative - Formal** · FY1999 · — · Final Order With Penalty
## Case
- **Activity ID:** `39513`
- **Case Number:** 06-1999-0849
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** $1K
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- EOTT ENERGY OPERATING PARTNERSHIP (complaint) (settlement)
## Summary

1. SECTION 311(B)(6)(B)(I) OF THE CLEAN WATER ACT ( CWA ),      33 U.S.C. SECTION 1321(B)(6)(B)(I), AS AMENDED BY THE OIL    POLLUTION ACT OF 1990.                                    2. EOTT ENERGY OPERATING LIMITED PARTNERSHIP                    FACILITY: EOTT ENERGY L.P. STORAGE TANK NO. 257                        SEC. 25, T10 N, R1 E, URANIA FIELD                           TULLOS, LA SALLE PARISH, LOUISIANA 71479        3. RESPONDENT WAS IN VIOLATION OF SECTION 311 OF THE CWA BY:    1) PLAN HAS INADEQUATE OR NO DISCUSSION OF FACILITY          DRAINAGE; 2) EXCESSIVE VEGETATION WHICH AFFECTS THE IN-      TEGRITY OF THE CONTAINMENT SYSTEM; 3) VISIBLE OIL LEAKS      RESULTING IN ACCUMULATION OF OIL IN DIKED AREAS ARE NOT      PROPMTLY CORRECTED; 4) PLAN HAS INADEQUATE OR NO DISCUS-     SION OF BULK STORAGE TANKS; 5) ABOVEGROUND VALVES AND        PIPELINES ARE NOT INSPECTED REGULARLY; 6) PLAN HAS INADE-    QUATE OR NO DISCUSSION OF FACILITY TRANSFER OPERATIONS,      PUMPING, AND IN-PLANT PROCESSES; 7) PLAN HAS ADEQUATE OR     NO DISCUSSION OF FACILITY TANK CAR AND TANK TRUCK LOAD-      ING/UNLOADING RACK; 8) FACILITY NOT FULLY FENCED AND EN-     TRANCE GATES ARE NOT LOCKED AND/OR GUARDED WHEN PLANT IS     UNATTENDED OR NOT IN PRODUCTION; 9) FACILITY LIGHTING NOT    COMMENSURATE WITH THE TYPE AND LOCATION OF FACILITY TO       FACILITATE THE DISCOVERY OF SPILLS DURING HOURS OF DARK-     NESS AND TO DETER VANDALISM; AND 10) PLAN HAS INADEQUATE     OR NO DISCUSSION OF FACILITY SECU

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*