# TUNDRA ENERGY - STAPLETON TANK BATTERY
> **Administrative - Formal** · FY1999 · — · Final Order With Penalty
## Case
- **Activity ID:** `39539`
- **Case Number:** 06-1999-0875
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** $1K
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- TUNDRA ENERGY (complaint) (settlement)
## Summary

1. SECTION 311(B)(6)(B)(I) OF THE CLEAN WATER ACT ( CWA ),      33 U.S.C. SECTION 1321(B)(6)(B)(I), AS AMENDED BY THE OIL    POLLUTION ACT OF 1990.                                    2. TUNDRA ENERGY                                                FACILITY: STAPLETON TANK BATTERY                                       SECTION 28, T8 N, R3 E, SOUTH JENA FIELD                     JENA, LA SALLE PARISH, LOUISIANA 71342          3. RESPONDENT WAS IN VIOLATION OF SECTION 311 OF THE CWA BY:    1) NO EVIDENCE OF THREE YEAR REVIEW OF PLAN BY OWNER/OP-     ERATOR; 2) INSPECTIONS REQUIRED BY 40 CFR PART 112 ARE       NOT IN ACCORDANCE WITH WRITTEN PROCEDURES DEVELOPED FOR      THE FACILITY; 3) WRITTEN PROCEDURES AND A RECORD OF IN-      SPECTIONS ARE NOT SIGNED BY FACILITY SUPERVISOR; 4) WRIT-    TEN PROCEDURES AND A RECORD OF INSPECTIONS ARE NOT MADE      PART OF THE PLAN; 5) WRITTEN PROCEDURES AND A RECORD OF      INSPECTIONS AND A RECORD OF INSPECTIONS ARE NOT MAINTAIN-    ED FOR THREE YEARS; 6) PLAN HAS INADEQUATE OR NO DISCUSS-    ION OF PERSONNEL AND SPILL PREVENTION PROCEDURES; 7) AC-     CUMULATED OIL IN THE SECONDARY CONTAINMENT SYSTEM(S) IS      NOT PICKED UP AND RETURNED TO STORAGE OR PROPERLY DIS-       POSED OF IN ACCORDANCE WITH THE REGULATIONS; 8) SECONDARY    CONTAINMENT APPEARS TO BE GROSSLY INADEQUATE FOR TANKS       AND CENTRAL TREATING INSTALLATIONS; 9) ABOVE GROUND          VALVES AND PIPELINES ARE NOT EXAMINED PERIODICALLY ON A      SCHEDULED BASIS FOR GENERAL CONDI

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*