# CHADCO, INC. - TENSAS BASIN LEVEE DISTRICT LEASE TANK BATTER
> **Administrative - Formal** · FY1999 · — · Final Order With Penalty
## Case
- **Activity ID:** `39543`
- **Case Number:** 06-1999-0879
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** $1K
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- CHADCO, INC. (complaint) (settlement)
## Summary

1. SECTION 311(B)(6)(B)(I) OF THE CLEAN WATER ACT ( CWA ),      33 U.S.C. SECTION 1321(B)(6)(B)(I), AS AMENDED BY THE OIL    POLLUTION ACT OF 1990.                                    2. CHADCO, INC.                                                 FACILITY: TENSAS BASIN LEVEE DISTRICT LEASE TANK BATTERY               TULLOS-URANIA FIELD                                          TULLOS, LA SALLE PARISH, LOUISIANA 71479        3. RESPONDENT WAS IN VIOLATION OF SECTION 311 OF THE CWA BY:    1) PLAN NOT CERTIFIED BY A PROFESSIONAL ENGINEER; 2) IN-     ADEQUATE OR NO PREDICTION OF EQUIPMENT FAILURE WHICH         COULD RESULT IN DISCHARGES; 3) INSPECTIONS REQUIRED BY 40    CFR PART 112 ARE NOT IN ACCORDANCE WITH WRITTEN PROCED-      URES DEVELOPED FOR THE FACILITY; 4) WRITTEN PROCEDURES       AND A RECORD OF INSPECTIONS ARE NOT SIGNED BY FACILITY       SUPERVISOR; 5) WRITTEN PROCEDURES AND A RECORD OF INSPEC-    TIONS ARE NOT MADE PART OF THE PLAN; 6) NO TRAINING ON       THE OPERATION AND MAINTENANCE OF EQUIPMENT TO PREVENT        DISCHARGES; 7) NO TRAINING ON THE APPLICABLE LAWS, RULES,    AND REGULATIONS; 8) SPILL PREVENTION BRIEFINGS ARE NOT       SCHEDULED AND CONDUCTED PERIODICALLY; 9) EXCESSIVE VEGE-     TATION WHICH AFFECTS THE INTEGRITY OF THE CONTAINMENT        SYSTEM; 10) INADEQUATE OR NO FLOWLINE MAINTENANCE PRO-       GRAM: AND 11) PLAN HAS INADEQUATE OR NO DISCUSSION OF OIL    PRODUCTION FACILITIES.                                    4. RELIEF SOUGHT PURSUANT TO SECTION

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*