# CANDLERIDGE OIL - URANIA 'B' LEASE
> **Administrative - Formal** · FY1999 · — · Final Order With Penalty
## Case
- **Activity ID:** `39547`
- **Case Number:** 06-1999-0883
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** $950
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- CANDLERIDGE OIL (complaint) (settlement)
## Summary

1. SECTION 311(B)(6)(B)(I) OF THE CLEAN WATER ACT ( CWA ),      33 U.S.C. SECTION 1321(B)(6)(B)(I), AS AMENDED BY THE OIL    POLLUTION ACT OF 1990.                                    2. CANDLERIDGE OIL                                              FACILITY: URANIA 'B' LEASE                                             W/2 SW/4NW/4 SECTION 17, T10 N, R2 E, TULLOS-                URANIA FIELD                                                 TULLOS, LA SALLE PARISH, LOUISIANA 71479        3. RESPONDENT WAS IN VIOLATION OF SECTION 311 OF THE CWA BY:    1) NO MANAGEMENT APPROVAL OF PLAN; 2) NO EVIDENCE OF         THREE YEAR REVIEW OF PLAN BY OWNER/OPERATOR; 3) INSPECT-     IONS REQUIRED BY 40 CFR PART 112 ARE NOT IN ACCORDANCE       WITH WRITTEN PROCEDURES DEVELOPED FOR THE FACILITY; 4)       WRITTEN PROCEDURES AND A RECORD OF INSPECTIONS ARE NOT       SIGNED BY FACILITY SUPERVISOR; 5) WRITTEN PROCEDURES AND     A RECORD OF INSPECTIONS ARE NOT MADE PART OF THE PLAN; 6)    WRITTEN PROCEDURES AND A RECORD OF INSPECTIONS ARE NOT       MAINTAINED FOR THREE YEARS; 7) NO TRAINING ON THE OPERA-     TION AND MAINTENANCE TO PREVENT DISCHARGES; 8) NO TRAIN-     ING ON THE APPLICABLE LAWS, RULES, AND REGULATIONS; 9)       SPILL PREVENTION BRIEFINGS ARE NOT SCHEDULED AND CONDUCT-    ED PERIODICALLY; 10) PLAN HAS INADEQUATE OR NO DISCUSSION    OF PERSONNEL AND SPILL PREVENTION PROCEDURES; AND 11) AC-    CUMULATED OIL IN THE SECONDARY CONTAINMENT SYSTEM(S) IS      NOT PICKED UP AND RETURNED TO STO

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*