# DANIEL R. SHINE, AN INDIVIDUAL
> **Administrative - Formal** · FY2000 · — · Unilateral Administrative Order Without Adjudication
## Case
- **Activity ID:** `39985`
- **Case Number:** 06-2000-0363
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Unilateral Administrative Order Without Adjudication
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** $4K
- **Multimedia (multi-env):** N
## Defendants
- DANIEL R. SHINE (settlement)
## Summary

1. SECTION 309(A) OF THE CLEAN WATER ACT ( CWA ), 33 U.S.C.     SECTION 1319(A).                                          2. DANIEL R. SHINE                                              FACILITY: THOUSAND OAKS SUBDIVISION                                    1763 COUNTY ROAD 323                                         LIBERTY HILL, WILLIAMSON COUNTY, TEXAS 78642    3. RESPONDENT WAS IN VIOLATION OF SECTION 301 OF THE CWA BY:    1) STORM WATER CONTROLS AND MEASURES SPECIFIED IN THE        STORM WATER POLLUTION PREVENTION PLAN (SWPPP) WERE NOT       INSTALLED; 2) THE PRIMARY METHOD OF EROSION AND SEDIMENT     CONTROL WERE THE BURSH BERMS; AND C) THE SWPPP WAS NOT       SIGNED AND DID NOT HAVE THE PROPER CERTIFICATION TO SIGN     AT THE TIME OF THE INSPECTION.                            4. RELIEF SOUGHT PURSUANT TO SECTION 309(A) OF THE CWA, EPA     ISSUED THE RESPONDENT AN ADMINISTRATIVE ORDER (AO) THAT      REQUIRED THE RESPONDENT TO: A) WITHIN 30 DAYS, TAKE WHAT-    EVER CORRECTIVE ACTION IS NECESSARY TO CORRECT THE DE-       FICIENCIES, ELIMINATE AND PREVENT RECURENCE, AND TO COME     INTO COMPLIANCE; B) WITHIN 30 DAYS, SUBMIT A WRITTEN RE-     PORT DETAILING THE SPECIFIC ACTIONS TAKEN AND EXPLAIN HOW    THESE ACTIONS WILL PREVENT RECURRENCE; AND C) WITHIN 45      DAYS, ARRANGE TO MEET WITH EPA AND SHOW CAUSE.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*