# LARGE OIL COMPANY - EAST 19 TANK BATTERY
> **Administrative - Formal** · FY2000 · — · Final Order With Penalty
## Case
- **Activity ID:** `40442`
- **Case Number:** 06-2000-0826
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** $2K
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- LARGE OIL COMPANY (complaint) (settlement)
## Summary

1. SECTION 311(B)(6)(B)(I) OF THE CLEAN WATER ACT ( CWA ),      33 U.S.C. SECTION 1321(B)(6)(B)(I), AS AMENDED BY THE OIL    POLLUTION ACT OF 1990.                                    2. LARGE OIL COMPANY                                            HC 60, BOX 47                                                OSAGE, OSAGE COUNTY, OKLAHOMA 74054                       3. RESPONDENT WAS IN VIOLATION OF SECTION 311(J) OF THE CWA     BY: 1) NO SPILL PREVENTION CONTROL AND COUNTERMEASURE        PLAN; 2) ACCUMULATED OIL IN THE SECONDARY CONTAINMENT        SYSTEM(S) IS NOT PICKED UP AND RETURNED TO STORAGE OR        PROPERLY DISPOSED OF IN ACCORDANCE WITH THE REGULATIONS;     3) FIELD DRAINAGE DITCHES, ROAD DITCHES, AND OIL TRAPS,      SUMPS, OR SKIMMERS ARE NOT REGULARLY INSPECTED FOR OIL,      AND/OR OIL IS NOT REMOVED; 4) BYPASS VALVE IS NOT OPENED     AND RESEALED UNDER RESPONSIBLE SUPERVISION; 5) ADEQUATE      RECORDS OF DRAINAGE EVENTS ARE NOT MAINTAINED; 6) SECOND-    ARY CONTAINMENT APPEARS TO BE GROSSLY INADEQUATE FOR         TANKS AND CENTRAL TREATING INSTALLATIONS; AND 7) INADE-      QUATE OR NO FLOWLINE MAINTENANCE PROGRAM.                 4. RELIEF SOUGHT PURSUANT TO SECTION 311(B)(6)(B)(I) OF THE     CWA, EPA ASSESSED THE RESPONDENT A CIVIL PENALTY OF          $2,350.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*