# DELTON DRUM - T. GONZELMAN LEASE, F.H. GREEN SURVEY
> **Administrative - Formal** · FY2000 · — · Withdrawn by Region/State
## Case
- **Activity ID:** `40542`
- **Case Number:** 06-2000-0927
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Withdrawn by Region/State
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- DELTON DRUM (complaint) (settlement)
## Summary

1. SECTION 311(B)(6)(B)(I) OF THE CLEAN WATER ACT ( CWA ),      33 U.S.C. SECTION 1321(B)(6)(B)(I), AS AMENDED BY THE OIL    POLLUTION ACT OF 1990.                                    2. DELTON DRUM                                                  T. GONZELMAN LEASE, F H. GREEN SURVEY                        BATSON, HARDIN COUNTY, TEXAS 77519                        3. RESPONDENT WAS IN VIOLATION OF SECTION 311(J) OF THE CWA     BY: NO EVIDENCE OF 3-YEAR REVIEW OF PLAN BY OWNER/OPERA-     TOR; 2) INSPECTIONS REQUIRED BY 40 CFR PART 112 ARE NOT      IN ACCORDNANCE WITH WRITTEN PROCEDURES DEVELOPED FOR THE     FACILITY; 3) WRITTEN PROCEDURES AND A RECORD OF INSPECT-     IONS ARE NOT MAINTAINED FOR 3 YEARS; 4) NO TRAINING ON       THE OPERATION AND MAINTENANCE OF EQUIPMENT TO PREVENT        DISCHARGES; 5) NO TRAINING ON THE APPLICABLE LAWS, RULES,    AND REGULATIONS; 5) NO DESIGNATED PERSON RESPONSIBLE FOR     SPILL PREVENTION; 6) SPILL PREVENTION BRIEFINGS ARE NOT      SCHEDULED AND CONDUCTED PERIODICALLY; 7) ACCUMULATED OIL     IN THE SECONDARY CONTAINMENT SYSTEM(S) IS NOT PICKED UP      AND RETURNED TO STORAGE OR PROPERLY DISPOSED OF IN AC-       CORDANCE WITH THE REGULATIONS; 8) DRAINS FOR THE SECOND-     ARY CONTAINMENT SYSTEMS AT THE TANK BATTERY(IES) AND CEN-    TRAL TREATMENT STATIONS ARE NOT CLOSED AND SEALED AT ALL     TIMES EXCEPT WHEN RAINWATER IS BEING DRAINED; 9) TANK        MATERIAL AND CONSTRUCTION ARE NOT COMPATIBLE WITH THE OIL    STORED AND THE CONDITIONS OF STOR

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*