← EPA enforcement cases

PHELPS DODGE TYRONE, INC.

Administrative - Formal · FY2001 · — · Unilateral Administrative Order Without Adjudication · 41467

Penalty
Cost recovery
Compliance action

Case

Case Number
06-2001-3307
Type
Administrative - Formal
Lead
EPA
Outcome
Unilateral Administrative Order Without Adjudication
Multimedia
N
Self-disclosure
N

Defendants (1)

Summary

1. SECTION 167 0F THE CLEAN AIR ACT ( CAA ), 42 U.S.C. SEC- TION 7477. 2. PHELPS DODGE TYRONE, INC. HIGHWAY 90 SOUTH, TYRONE MINE ROAD, P.O. DRAWER 571 TYRONE, GRANT COUNTY, NEW MEXICO 88065 3. RESPONDENT ALLEGED THAT IT WAS NECESSARY TO INCREASE OP- ERATION AT THE POWR PLANT IN RESPONSE TO DRAMATIC CHANGES IN THE AVAILABILITY AND COST OF POWER ON THE WESTERN SYSTEMS COORDINATING COUNCIL ( WSCC ) ELECTRICAL POWER GRID. IN ORDER TO MAXIMIZE ITS ONSITE ELECRRICAL GENERATING CAOACITY, THE RESPONDENT ESTIMATES THAT AN EX- PENDITURES OF APPROXIMATELY $3 MILLION IS NECESSARY FOR THE REPAIR AND MAINTENACE OF ITS POWER PLANT. NMED AND EPA ARE OFP POSITION THAT REPAIRING AND OPERATING THE POWER PLANT WOULD RESULT IN A PHYSICAL CHANGE THEREBY IN- CREASING AIR POLLUTION EMISSIONS ABOVE HISTORICAL LEVELS IN AMOUNTS THAT WOULD EXCEED PSD SIGNIFICANT LEVELS AND CONSTITUTE A PSD MAJOR MODIFICATION OF A MAJOR STATIONARY SOURCE. 4. RELIEF SOUGHT PURSUANT TO SECTION 167 OF THE CAA, EPA AND THE RESPONDENT ENTERED INTO AN ADMINISTRATIVE ORDER ON CONSENT (AOC) IN ORDER TO AVOID PROTRACTED LITIGATION AND TO ASSIST IN ALLEVIATING THE CURRENT ENERGY GENERATION SHORTAGE IN THE WSCC ELECTRICAL GRID. THE AOC REQUIRES THE RESPONDENT TO OBTAIN A PSD PE

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown