# TDC ENGINEERING, INC. - TALIAFERRO WELLS
> **Administrative - Formal** · FY2002 · — · Final Order With Penalty
## Case
- **Activity ID:** `42114`
- **Case Number:** 06-2002-4306
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** $450
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- TDC ENGINEERING, INC. (complaint) (settlement)
## Summary

1. SECTION 311(B)(6)(B)(I) OF THE CLEAN WATER ACT ( CWA ),      33 U.S.C. SECTION 1321(B)(6)(B)(I), AS AMENDED BY THE OIL    POLLUTION ACT OF 1990.                                    2. TDC ENGINEERING, INC. - TALIAFERRO WELLS                     SECTION 14, LUNATIC ASYLUM LANDS                             ABILENE, TAYLOR COUNTY, TEXAS 79604                       3. RESPONDENT WAS IN VIOLATION OF SECTION 311(J) OF THE CWA     BY: 1) NO EVIDENCE OF THREE YEAR REVIEW OF PLAN BY OWNER/    OPERATOR; 2) WRITTEN PROCEDURES AND A RECORD OF INSPECT-     IONS ARE NOT MAINTAINED FOR THREE YEARS; 3) PLAN HAS IN-     ADEQUATE OR NO DISCUSSION OF PERSONNEL AND SPILL PREVENT-    ION PROCEDURES; AND 4) VISUAL TANK INSPECTIONS ARE NOT       CONDUCTED PERIODICALLY BY APPROPRIATE PERSONNEL AND/OR       INSPECTIONS DO NOT INCLUDE TANK FOUNDATION AND SUPPORTS.  4. RELIEF SOUGHT PURSUANT TO SECTION 311(B)(6)(B)(I) OF THE     CWA, EPA ASSESSED THE RESPONDENT A CIVIL PENALTY IN THE      AMOUNT OF $450 FOR THE VIOLATIONS CITED.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*